Skip to content

Phone lines open 24 hours

EV Charger Installation in Nottingham

Home and workplace charge points, installed to BS 7671 and the IET Code of Practice, commissioned and certified.

Get a EV charger installation quote

Priced after we understand the job

What it is

A charge point is a high-demand, continuous load, so the installation has to be designed around your supply, earthing arrangement and existing circuits. We survey first, confirm the supply can support the charger, install it on its own circuit, and commission and certify it. Where a supply upgrade or network operator notification is needed, we'll explain the steps.

What's included

  • Pre-installation survey
  • Dedicated circuit and protection
  • Commissioning
  • EIC and Building Regulations notification

Not included

  • Supply upgrades by the network operator
  • Groundworks beyond the agreed scope

Who needs it

  • Homeowners with off-street parking
  • Businesses adding workplace charging
  • Landlords and developers

What you'll receive

Electrical Installation Certificate and commissioning records.

How often

Once; periodic inspection thereafter.

What the rules say

Each point is labelled so you can tell what's law, what's a British Standard, and what's good practice or comes from your lease, licence or insurer.

Before your appointment

  • Tell us where the car parks and where your consumer unit and meter are.
  • Check whether your supply has a main fuse rating and earthing type we need to know (we can check on a survey).

If something's found

  • If your supply or earthing needs work first, we explain and quote before installing.
  • You receive an Electrical Installation Certificate and the work is notified under Part P.

What affects the price

  • Cable route length
  • Consumer unit capacity and any upgrade
  • Earthing arrangement
  • Charger model

Read more

Call usBook online