What it is

When an installation is altered or extended, the new work must be inspected and tested, and the existing installation must be checked to confirm it can safely support the change — for example that the earthing, bonding and supply are adequate. We test the work we carry out and issue an EIC or MEIWC as appropriate. Where the alteration was made by others, we can inspect and report on its condition.

What's included

  • Scope agreed in writing
  • Inspection and testing
  • Appropriate certificate or report

Not included

  • Design and installation unless separately agreed

Who needs it

  • Extensions and refurbishments
  • Change-of-use projects
  • Contractors needing independent testing

What you'll receive

EIC, MEIWC or EICR depending on who carried out the work and its extent.

How often

After each alteration.

What the rules say

Each point is labelled so you can tell what's law, what's a British Standard, and what's good practice or comes from your lease, licence or insurer.

Before your appointment

  • Tell us what was altered, by whom, and whether it was inspected and tested as it was installed.
  • Have any certificates for the work to hand.

If something's found

  • If the work was done by someone else and wasn't certified, we can report on its condition with an EICR. We can't issue a certificate for work we didn't design or see installed.
  • Defects are quoted for and certified once put right.

What affects the price

  • Extent of the alterations
  • Whether records exist
  • Access to the new work