Industrial Electrical Testing in Nottingham

Inspection and testing of three-phase installations, distribution systems and fixed machinery supplies in factories, warehouses and workshops.

Get a Industrial testing quote

Priced after we understand the job

What it is

Industrial installations work harder than most and see more change: new machinery, extensions, harsher environments. We plan inspection and testing around production, agree isolation windows, and report on distribution boards, sub-mains and final circuits feeding fixed equipment. Larger sites can be split into a rolling programme so the whole installation is covered over an agreed cycle. Observations are coded C1 (danger present), C2 (potentially dangerous), C3 (improvement recommended) or FI (further investigation advised). A C1 or C2 makes the report unsatisfactory. On reports made to the 2026 edition of the wiring regulations (BS 7671 Amendment 4), C3 and FI don't change the overall result; on older reports an FI also made it unsatisfactory.

What's included

  • Site survey and inspection plan
  • Three-phase distribution and sub-main testing
  • Final circuits supplying fixed machinery
  • Out-of-hours working where needed
  • Rolling programme option for large sites

Not included

  • Machine-internal control wiring
  • Remedial work
  • Specialist systems unless agreed in the quote

Who needs it

  • Factories, warehouses and workshops
  • Duty holders under the Electricity at Work Regulations 1989
  • Sites required to provide evidence to insurers or auditors

What you'll receive

EICR in the BS 7671 model format, with an executive summary and prioritised findings.

How often

Set by risk and condition. Industry guidance (IET Guidance Note 3) is commonly quoted as up to 3 years for industrial installations, and shorter for harsh or high-risk environments.

What the rules say

Each point is labelled so you can tell what's law, what's a British Standard, and what's good practice or comes from your lease, licence or insurer.

Before your appointment

  • Agree isolation windows or planned shutdowns, and list any machinery that mustn't lose power without warning.
  • Share single-line diagrams, distribution board schedules and the previous EICR.
  • Tell us about permits to work, site inductions and PPE rules before the visit.

If something's found

  • Findings are prioritised in an executive summary for duty holders, with C1 and C2 items first.
  • Anything dangerous is reported to you straight away, with options to make it safe.
  • Further work is quoted before we do it, so nothing is added to your bill without your agreement.
  • Completed work is certified, and notified to building control where the law requires it.

What affects the price

  • Size of the site and number of distribution boards
  • Shutdown and out-of-hours working
  • Access equipment for high-level containment
  • Rolling programme versus a single visit

Read more

Questions

Can testing be done without stopping production?

Usually in stages. We agree isolation windows in advance and can work evenings, weekends or during planned shutdowns.